Deterministic Safety Analyses
Technical Support of Development and Updating of Accident Management Procedures
Elaboration of the preliminary analyses and validation of thermohydraulic analyses used for Accident Management (AccM) procedures applied at the Czech NPPs. The technical support provided to NPP operator also includes elaboration of training materials, NPP personnel training and participation at the full-scope simulator training. AccM procedures are continuously reviewed and updated according to the realized modifications of the NPP equipment and/or power up-rating.