Periodic Testing of NPP Safety Systems

Úvod > Reference > Periodic Testing of NPP Safety Systems
Engineering support of the NPP operation
Periodic Testing of NPP Safety Systems

The project has been set up to provided  programme development, implementation and evaluation of the safety systems within performance of periodic testing of NPP equipment, including power supply. Periodic testing of safety systems is required by the State Office of Nuclear Safety of the Czech Republic.

Zákazník
ČEZ, a.s.
Lokalita
ČEZ, a.s., Dukovany NPP, Temelín NPP
Realizováno
since 1992
Všechny reference
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.