In 2018 TES experts significantly contributed to the evaluation of nuclear safety aspects at the Temelín NPP within Periodic Safety Review (PSR) after 20 years of operation, specifically in the area no. 5 “Deterministic Safety Analysis” of PSR. In the frame of the project TES conducted the evaluation of all safety aspects of deterministic analyses developed in TES for Temelín NPP from 2007 to 2017. In addition  TES provided independent review of evaluation of deterministic analyses carried out for Temelín NPP by other bodies between 2007 and 2017. The outcomes of the evaluation serve as a basis for the State Office of Nuclear Safety (SÚJB)  assessment of the Temelín NPP after 20 years of operation.

Zákazník
ČEZ, a.s.
Lokalita
Temelín NPP (Czech Republic)
Realizováno
2018
Všechny reference
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.